LAHORE – National Transmission and Despatch Company Limited (NTDC) have installed a shunt reactor on the 500 kV Guddu-Rahim Yar Khan Transmission Line to enhance power system stability.
Installed on Bay-02 of the Guddu – RYK transmission line, the shunt reactor was energized successfully after all testing.
The newly installed shunt reactor will help control power system voltage…
Continue Reading
News Source: pakobserver.net
Leave a Reply
You must be logged in to post a comment.